Kanban board: how to organize tasks and spot bottlenecks
Kanban shows each task as a card that moves across columns, from “to do” to “done”. See how to set up the board, limit work in progress and use the board to improve the flow.
The list that lives in someone’s head
A small store is about to reopen after a renovation. The tasks are scattered: some in the group chat, others in one partner’s notebook, most in the head of whoever remembered them in the shower. Every conversation starts with “what about that thing, is it done?”, and nobody can answer without asking someone else.
A Kanban board solves this with a simple idea inherited from Japanese car manufacturing: each piece of work becomes a card, and the card moves left to right through columns that represent the stages. Anyone looking at the board knows in seconds what’s waiting, what’s in progress and what’s finished.
First hour: get everything out
The first step isn’t drawing columns, it’s emptying heads. Gather people for half an hour and ask each to write down every pending task they know of, one per card. Don’t discuss priority yet. Then merge the duplicates.
Rewrite each card with a verb and an object: “Banner” becomes “Get a quote for the banner”; “Lease” becomes “Review the lease”. If a task is too big to finish in a few days, such as “Prepare the reopening”, it’s a project, not a card, and needs breaking down.
Three columns, for now
Start with to do, in progress and done. It seems like too little, and that’s deliberate: with three columns, every card has an obvious place and nobody wastes time deciding where it goes. New columns only come in when a real stage shows up often, such as “in review” for a team that reviews everything it produces.
Be careful with a “waiting” column. It looks useful, but it tends to become a dump where cards get forgotten. Instead, leave the card where it is and mark it as blocked, with the reason and the name of whoever will unblock it. The blocker stays visible and has an owner.
The reopening on the board
After that first hour, the store’s board looked like this. To do: get a quote for the banner, compare suppliers and review the lease. In progress: set up the shop window and photograph the products. Done: register the new location.
At the first weekly check-in, one detail stood out: the lease had been in “to do” for ten days, because it depended on the accountant. The card got a blocked marker with the reason, and Marcos took charge of chasing the answer. Without the board, that delay would have surfaced the day before the reopening. The figure below shows the board at that moment.
What the board shows without anyone saying it
An up-to-date board speaks for itself, as long as someone looks at it with the right questions. A card sitting in the same column for many days is a problem nobody mentioned. A full column next to an empty one shows a bottleneck: work arrives faster than that stage can handle. Several cards blocked by the same person or area point to a dependency that needs a conversation, not more chasing.
And cards moving back from done to in progress mean “done” isn’t well defined. It’s worth agreeing, in writing, what has to be true for a card to reach the last column.
Start less, finish more
Kanban’s most powerful rule sounds counterintuitive: limit how many cards can be in progress at once, for example two per person. When the limit is reached, nobody pulls a new task; they finish or unblock one already started.
In the first week it feels slower. After that, deliveries become steadier, because attention stops being split across six half-done things. If you want to dig into the rules that keep a board working, such as the definition of done and the weekly review, we have a guide just on that.
When a board dies, and how to prevent it
Kanban boards die of neglect. One week without anyone moving cards is enough for the team to drift back to the group chat. Agree that everyone moves their own cards as soon as something changes, and that the weekly review happens standing in front of the board, in fifteen minutes.
On Qriou.org, cards move by dragging, with the buttons on each card or with the keyboard, and you can edit the text and owner and undo an accidental delete. The board is saved in your browser and can be exported to PNG or PDF. If the work has many dates and dependencies between tasks, a timeline will serve better than Kanban; the two can live side by side.