RACI matrix: what it is, how to build one and when to use it

A RACI matrix makes clear who does the work, who approves, who is consulted and who needs to be informed for each task. See how to build one in a few steps.

“I thought you had it”

Almost every project that slips for no technical reason has a similar scene. The layout was ready on Friday, nobody approved it, and the following Wednesday the designer asks the project manager whether to move on. The manager thought the marketing director had approved it. The director thought he didn’t need to see it. Nobody acted in bad faith; nobody had written down who decides.

A RACI matrix is a simple table that fixes exactly that: rows for what needs doing, columns for people or roles, and in each cell a letter saying how that person takes part in that deliverable.

Four letters, one sentence each

Each letter fits in a sentence:

  • R (Responsible): does the work. There can be more than one.
  • A (Accountable): answers for the result and has the final say. Only one per deliverable.
  • C (Consulted): must be heard beforehand, because they know something that changes the outcome. Two-way conversation.
  • I (Informed): needs to know afterwards that it happened. One-way notice.

Rows are deliverables, columns are roles

Start by listing deliverables with a verb and an object: “Approve the page layouts”, not “Design”. A vague activity becomes a vague cell, and a vague cell is exactly where “I thought you had it” moves in. Twelve to fifteen rows are usually enough for a small or medium project; past thirty, you’re probably describing daily tasks, not deliverables.

For columns, prefer roles to names: “Designer” still holds when the designer goes on vacation; “Ana” doesn’t. And fill each row in a fixed order: the A first, then the R, and only then the Cs and Is. Deciding the A first forces the hard conversation to happen early.

The website launch, row by row

Picture a corporate website project with four roles: project manager, designer, developer and marketing director. Three deliverables sum up the path.

Define the scope of the pages: the project manager does it (R), the marketing director approves (A), designer and developer are consulted (C), because they know what fits in the schedule. Create the page layouts: the designer does it (R), the project manager approves (A), the marketing director is consulted (C) and the developer is informed (I). Publish the website: the developer does it (R), the project manager approves (A), the other two are informed.

The opening scene would never have happened: the layout row says the project manager approves, and the director only needs to be heard beforehand. The figure below shows the matrix built in the editor.

The example matrix: each task has exactly one A, and people who only need the outcome appear as I.Open this example in the editor

Read along the rows

Every row needs exactly one A and at least one R. Two As in a row is the polite way of saying nobody decides; when it shows up, ask “if they disagree, who wins?” — the answer is the A. A row without an R is a deliverable nobody will produce. A row with four Cs is a deliverable that will be slow: each consultation is a meeting to schedule, so keep only those who really change the outcome.

Read down the columns

This is the reading few people do, and the one that reveals the most. Go down each person’s column. A column full of As shows a bottleneck: the whole project waits on one person’s calendar. In the website matrix, the project manager has two As in three rows, which is reasonable, but on a project with fifteen deliverables it would be time to delegate some approvals.

A column with no R at all shows someone who only approves or advises, and it’s worth confirming that’s intended. A column of nothing but Is shows someone who may not need to be on the project at all, just on the weekly status email. And a column with an R almost everywhere shows the person who will be overloaded before anyone notices.

The conversation the matrix forces

The matrix is worth as much for the meeting where it’s presented as for the table itself. Show the draft to the people on it and ask each one to check their own column. That’s when disagreements surface that would otherwise stay hidden until the first delay — like the director who thought he should approve the layout.

For a team of three working side by side, a formal matrix is usually overkill. It starts to pay off when several areas are involved, people come and go, or there are recurring arguments about who owns what.

Variations and upkeep

You’ll come across variations. RASCI adds S, for support, for those who help whoever does the work. DACI, common in product decisions, swaps the letters for driver, approver, contributors and informed. For most teams, classic RACI is enough; only switch if there’s a problem it doesn’t solve.

Review the matrix at project milestones and whenever someone joins or leaves. In the Qriou.org RACI matrix editor, the project is saved in your browser and can be exported to CSV to share with the team. If an argument starts about who owns a task, the answer has to be in the matrix; if it isn’t, the matrix needs updating.