GUIDES · RACI MATRIX

Responsible vs. accountable: how to keep red tape from stalling your project

Confusing who does the work with who decides causes many bottlenecks. Understand the difference between R and A in a RACI matrix and how to design approvals that do not slow work down.

Four sign-offs for one post

At a mid-sized company, every marketing campaign had to go through four people before going live: coordinator, manager, director and legal. That applied to a new product launch, and it applied to the weekly post with the usual promotion. Each approval took one to three days, and the result was predictable: campaigns going out weeks late and a team that stopped proposing last-minute ideas because “there’s no time to get it approved”.

Nobody had decided it should be that way. The approvals piled up as precautions, one at a time. The fix started with a distinction the RACI matrix makes and almost everyone blurs: who does the work and who answers for it.

Doing and answering are not the same

In RACI, R (responsible) is whoever does the work. A (accountable) is whoever answers for the result and has the final say. On a building site, the bricklayer puts up the wall; the engineer who signs the plans answers for it being right. They’re different roles, even when one person holds both.

Two questions help tell them apart: “who will do it?” finds the R; “who can say it’s done and live with the consequences?” finds the A. Each deliverable has a single A. Four people approving the same campaign aren’t four layers of safety; they’re four places where the decision can stall, and no real owner.

The question that split campaigns in two

Going through recent campaigns, the team noticed most followed templates approved long before: same language, same format, same commercial terms. A mistake in one of those would cost little and be fixed in minutes. Others were different: a new product, a promise about price, delivery time or warranty. A mistake there could turn into a formal complaint or a legal problem.

That produced the criterion, which works for any task: a separate approver is only justified when a mistake is costly, hard to undo or affects other areas. Otherwise, the person doing the work can approve it. R and A in the same person isn’t carelessness; it’s autonomy with a defined scope.

The new path for campaigns

The final design has two paths. A new campaign or one making commercial promises: legal reviews as consulted (C) and the manager approves (A). A routine campaign within the templates: the coordinator does it and approves it (R and A), and the manager is simply informed (I). The director left the day-to-day flow and now gets a monthly summary of what was published.

The flowchart below shows that rule. Notice that the RACI matrix says who takes part, but not the order or the fork; that’s why, for approvals, it’s worth having both drawings side by side.

The example’s rules as a flow: the stronger approval only sits on the higher-risk path.Open this example in the editor

Decision bands instead of “the boss approves”

For decisions involving money, splitting by risk becomes bands. Expenses up to a certain amount are approved by the coordinator; a middle band by the manager; above that, by the director. In the matrix, each band gets its own row with its own A. The numbers depend on each company; what matters is that they’re written down and everyone knows where to find them.

Review the bands once or twice a year. Amounts that made sense when the company had ten people tend to block everything when it has fifty.

Approvals with an expiry date

Sometimes the problem isn’t who approves, it’s the lack of a deadline. Agree with each approver on a maximum response time, such as two business days, and what happens if it passes: the decision moves up a level, the recommendation of whoever did the work stands, or the item goes to the next priorities meeting. Waiting stops being open-ended.

The other half of the deal belongs to whoever asks: deliver material that’s ready to decide on, with what changes, the criteria used and a clear recommendation. Approving a well-presented piece takes minutes; deciphering a confusing request takes days, and the approver gets the blame.

Who is a C but should be an I

Too many consulted people stall work as much as too many approvers, because each C is a reply to wait for. Go through the matrix and, for each C, ask: does this person’s opinion usually change the outcome? If the honest answer is no, they’re an I. They receive the decision instead of taking part in it, and nobody waits on them.

In the campaign case, legal stayed a C, but only on the high-risk path. On routine campaigns, legal simply doesn’t appear.

Signs it’s stalling again

Approval designs decay slowly, one exception at a time. Review the matrix when you see any of these signs:

  • Finished work waiting days for sign-off, with nobody sure whose.
  • The same name as A on almost every row.
  • The team asking the manager about details they could already decide.
  • People working around the process to save time, which means it has already lost its legitimacy.